You are here: Home » News » Our Process » From Sketch to Confirmed Sample in 15–20 Days

From Sketch to Confirmed Sample in 15–20 Days

Author: Summer     Publish Time: 2026-10-16      Origin: Site

Inquire

facebook sharing button
linkedin sharing button
twitter sharing button
whatsapp sharing button
line sharing button
wechat sharing button
pinterest sharing button
kakao sharing button
telegram sharing button
snapchat sharing button
sharethis sharing button
From Sketch to Confirmed Sample in 15–20 Days

A confirmed sample is the most important document in a garment order. It is the physical reference that both sides measure against for the rest of the project — the fabric, the colour, the fit, the construction, the finishing. Everything after it is measured against it.

Here is how the 15–20 days actually break down, and where orders lose time.

The brief stage: construction, fabric and quantity questions answered before anything is cut.

The brief stage: construction, fabric and quantity questions answered before anything is cut.

Stage 1 — Brief and feasibility check (day 1–2)

We read the brief the way a production planner reads it, not the way a buyer writes it. Construction: can this be sewn the way it is drawn? Fabric: can we get it, at your quantity, in your colour? Details: is the pocket, placket or finish producible at 50 pieces, or does it need a process with its own minimum? Quantities: where does the size curve create a problem?

You get questions back, not silence. Most delayed samples started with a brief that nobody questioned.

Stage 2 — Pattern drafting (day 3–7)

The pattern comes from your spec, or from a reference sample that we measure down. This is where the fit decisions get fixed: ease, shoulder slope, armhole depth, body and sleeve length. A pattern is also where you can see, in flat form, whether a design idea survives contact with a real body.

Changes at this stage cost a phone call. Changes after bulk cutting cannot be undone.

Stage 3 — Fabric and trim sourcing (day 3–8, in parallel)

Fabric and trims are confirmed in parallel with pattern drafting — never after the sample is cut.

Fabric and trims are confirmed in parallel with pattern drafting — never after the sample is cut.

This runs alongside the pattern, not after it. Fabric, lining, pocketing, buttons, interfacing, zips, labels. If a fabric is not available at the right weight or colour, we raise it here and propose an alternative with the closest hand feel — never as a surprise after the sample is cut.

Stage 4 — First sample (day 8–12)

Cut and sewn as a complete garment, in the real fabric wherever possible. A first sample made in substitute fabric is a sketch, not a sample — it cannot be fitted honestly.

Stage 5 — Fitting comments and revision (day 12–17)

You fit it, mark it, photograph it, send comments. We revise. Written comments are useful; written comments with measurements are much faster, because they remove the guessing.

Stage 6 — Confirmed sample and strike-off (day 17–20)

The revised sample is reviewed against the brief and signed off as the reference for bulk. For printed garments, we send a digital strike-off for approval before printing a single metre, so colour and layout are agreed on screen first.

Where the timeline actually slips

  • Comments without measurements. "Make it a bit longer" costs two revisions. "Add 3 cm to the body" costs none.

  • Fabric not confirmed before sampling. The sample is made in something close, the bulk arrives in the real thing, and nothing matches.

  • The design moves mid-sample. A new detail or a new silhouette means a new pattern, and the clock restarts.

  • Trim details left open. Buttons, labels and interfacing are small decisions with long lead times.

What the sample costs

Sampling is one-off labour; bulk production is repeat labour. We quote sample development separately rather than hiding it inside the unit price, and when a bulk order follows, the development cost is amortised into it. That way you can see exactly what you are paying for at each stage.

Questions we are asked most

How long does a confirmed sample take?

15–20 days from brief confirmation.

How much does it cost?

It depends on the fabric and the printing method. Send the brief and we will quote it before anything is cut.

Can you work from a photograph?

Yes, as a starting point. We will still ask for a reference sample or a set of measurements, because a photo carries no fit information.

How many revisions are included?

One revision is normal and expected. We price the sample so that a second round is a discussion, not a crisis.

Have a design in mind? Send a sketch, a photo or a sample you already own. We will come back with an honest read on feasibility, timeline and cost before you commit.

content is empty!

Leave a Message
Contact us

Company info

Product list

Product list

Contact us

 
Email: summerxia@isaiahtextile.com
 
WhatsApp: +86 13564178709
  
isaiah MIC